Environmental Compliance
Site assessment and storage tank services, from records review through subsurface investigation, corrective action planning and tank closure.
Situations that call for site assessment support
A transaction has to close
A Phase I Environmental Site Assessment satisfies lender and buyer due diligence to the ASTM E1527 standard practice.
A Phase I identified a recognized environmental condition
Phase II subsurface investigation and sampling confirms or dismisses the condition before it becomes a liability.
Contamination is confirmed
Phase III delineation and a corrective action plan establish remediation approach, schedule and cost.
An underground storage tank has to come out
Closure and removal with excavation oversight, confirmatory soil sampling and disposal documentation.
Tank integrity must be demonstrated
Precision tightness testing of tank and piping systems for release detection and closure requirements.
A lender, agency or insurer is asking for documentation
Reports document methods, sampling locations, laboratory results and the standards the work was performed under.
Closing on a property?
Send the address and your closing date. A project manager confirms the assessment scope and turnaround.
(610) 891-0114 · Toll free 1-800-9696-AET
1055 E. Baltimore Pike, Suite 302, Media, PA 19063
What we do
Phase I Environmental Site Assessments
Records review, site reconnaissance and interviews to identify recognized environmental conditions on a property, performed to the ASTM E1527 standard practice and EPA’s All Appropriate Inquiry rule.
Phase II Environmental Site Assessments
Subsurface investigation and sampling of soil, soil gas and groundwater to confirm or dismiss the conditions identified in a Phase I.
Phase III Environmental Site Assessments
Delineation of confirmed contamination and development of a corrective action plan, including remediation approach, scheduling and cost.
Underground Storage Tank (UST) Removal
Closure and removal of underground storage tanks, including excavation oversight, confirmatory soil sampling and disposal documentation.
Tank Tightness Testing
Precision testing of tank and piping systems to demonstrate integrity and satisfy release detection and closure requirements.
- ASTM E1527 — Standard Practice for Phase I Environmental Site Assessments
- 40 CFR part 312 — EPA All Appropriate Inquiry rule
- ASTM E1903 — Standard Practice for Phase II Environmental Site Assessments
- 40 CFR part 280 — Technical standards for underground storage tanks
- State storage tank program requirements for closure and release detection
- Proper identification and disposal of unknown waste containers encountered on site
AET’s environmental insight is rooted in safety and sound judgement and tempered with practicality and common sense.